Projects

Karara Mining Limited

  • 2012 - Three Springs 330/132/22kV Terminal

Three Springs Terminal was a new 330/132/22kV Terminal, feeding 330kV line to Karara mine. Scope of Works include fabrication and electrical construction works for  two bays of 330kV breaker and a half switchyard feeding a 490MVA transformer  to 132kV circuit, 330kV tariff metering, protection, SCADA and communications.

Western Power

  • 2012 - Mumbida Substation

Construction of 132kV Substation for interconnection of Mumbida Wind Farm. Scope of Works include electrical construction works for 132kV circuits, tariff metering, protection, SCADA and communications.

Verve Energy - Greenough River Solar Farm

  • 2012 - Mungarra Power Station

Construction of 22/132kV circuit for interconnection of Grenough River Solar Farm. Scope of Works include electrical construction works for 132kV circuit, tariff metering, protection, SCADA and communications.

Western Power

  • 2012 - Mungarra Substation Bay 8

Construction of 132kV circuit for interconnection of Grenough River Solar Farm. Scope of Works include electrical construction works for 132kV circuit, tariff metering, protection, SCADA and communications.

Areva T-D

  • 2011 - SIMCOA

Installation of Transformer 6 132kV circuit - new 132/22/11kV facility alongside the existing facility. Scope of Works include civil and electrical works for 132kV transformer circuit, 132/22/11kV transformer and 11kV Switchroom with indoor switchgear. Installation, assembly and commissioning of the transfomer and associated switchgear. Upgrade of tariff metering to existing 132kV circuits.

Western Power

Preferred Vendor Contract to Western Power - since 2004 Switchyard Construction projects (up to 330kV) include but are not limited to the following

  • 2011 - Albany Substation Grassmere Windfarm Circuit

Construction of 22kV feeder circuit for interconnection of Grassmere Windfarm to SWIS. Scope of Works include civil and electrical construction works for 22kV circuit, tariff metering, protection, SCADA and communications. Contract also includes integration of fault recorder to substation circuits.

  • 2011 - Sawyers Valley Substation

Sawyers Valley Substation is a new 132/22kV facility alongside the existing 66/22kV facility. Scope of Works include 132kV lines and busbar, 132/22kV transformer and 22kV Switchroom with indoor switchgear, control building and Capacitor Banks. 

  • 2010 - Wangara Substation

Wangara Substation is a new 132/22kV facility, including 132kV lines and busbar, 132/22kV transformer and 22kV Switchroom with indoor switchgear, control building and Capacitor Banks. 

  • 2009 - Busselton Substation

Busselton Substation was upgraded to include 132/22kV facilities including 132kV lines and busbar, 132/22kV transformer and 22kV Switchroom with indoor switchgear. 

  • 2009 – Blue Waters Terminal 330kV Mesh Switchyard Stage 2               

Blue Waters Terminal Stage 2 was constructed for the integration of Blue Waters Power Station Unit 2. Works included the fabrication and construction of primary and secondary works for the Power Station 330kV works in conjunction with the Switchyard expansion. 

  • 2008 – Wells Terminal 330/132kV Mesh Switchyard

Wells Terminal was a new 330/132kV Terminal, feeding 132kV lines to Boddington Gold mine and Guildford Terminal in Perth. 

  • 2007 - Shotts 330kV Terminal Augmentation of Breaker and a half confguration yard

The expansion and re-configuration of the Shotts Terminal was the combination of three separate projects, each with their own completion dates and critical supply issues. The existing line from Muja P/S in Bay 3 had to be relocated to the new Bay 2 line position to allow the entry of a new line from Kemerton Terminal to be fed through Bay 3. Collie Power Station line at Bay 4 was to be relocated to Bay 3 and part way through the Stage 2 works schedule, it was determined that a generator maintenance outage at Collie Power Station the end of November would present an opportunity to shift the 330kV line entry at Shotts Terminal from Bay 4 to Bay 3 with the least disruption to Verve Energy and Western Power. 

  • 2007 - Kemerton Terminal 330kV Stage 3 augmentation for Muja PS, Shotts Terminal, Land Weir Terminal and Oakley Terminal lines

The expansion and reconfiguration of Kemerton Terminal involved the construction of Bay 3 line entry, including A frame gantry, and Bay 6 position 1 equipment to allow the connection of Muja Power Station 330kV line to Bay 3, Shotts/Land Weir line to Bay 5. These works were carried out concurrently with the Shotts Terminal project referred to above

  • 2007 - Southern Terminal 132kV Bay 11
  • 2007 - Southern Terminal 330kV Bay 6
  • 2007 - Glen Iris PTA 132kV Line Protection
  • 2006 - Southern Terminal 132kV Reactors
  • 2006 - Guildford Terminal 132kV Secondary Electrical
  • 2006 - Desalination Plant Kwinana 132kV
  • 2006 - Geraldton Substation Bay 10 
  • 2006 - Northern Terminal 132kV Bay 38
  • 2005/06 - Muja P/Station 132kV Bay 14
  • 2005 - Kemerton Power Station 330kV
  • 2005 - Kemerton Terminal 330kV Stage 2 

Verve Energy

  • Central Water Facility Electrical Installation
  • Design, Supply and Commission electrical services to 5H Void pump station
  • Shotts Borefield - Design, construct and commission 185kW bore pump stations
  • Miscellaneous works including 3.3kV Switchboard repairs, PLC upgrades, MCC upgrades plant replacements
  • Flyash and precipitator control PLC installation and upgrades
  • Coal plant crushing and reclaim facilities PLC upgrades    (while ensuring daily operations of coal plant )
  • 11kV Power distribution ringmain incorporating approximately approximately 4 kms of ringmain and fibre optic commmunications cabling, 5 sets of switchgear and distribution transformers 

BGC

  • Electrical construction for Bridgetown Wastewater Treatment Plant
  • Electrical construction for Yanchep Wastewater Treament Plant
  • Electrical construction for Acacia Prison Wastewater Treatment Plant

Weir Services Australia

  • Design, construct and commission electrical and instrumentation for Boddington Gold Mine Wastewater Treatment Plants
  • Design, construct and commission electrical and instrumentation for BHP Ravensthorpe Nickel Refinery and camp Wastewater Treatment Plants
  •  

Laing O’Rourke

  • Electrical construction and commissioning of Woodchip mill facility at Bunbury Port
  • Commissioning of Coal handling Stacker and Reclaimer facility at Collie Power Station

Environmental Solutions International

  • Design and construction electrical and instrumentation for Kemerton Wastewater Treatment Plant

(Work on this project resulted in Hueppauff Electrical receiving Electrical Contractors Association “Excellence Award 2003 Small Enterprise Division”)

 

Solutions for Industry - Electrical, Firbre and Data

Contact Details

Postal Address
PO Box 5006 Bunbury WA 6231
Address
9 Marchant Street,
Davenport WA 6230
Phone
(08) 9726 2290

Contact Form

Required information
Enquiry